Pyrozone

5th September 2006

Upon the completion of the new manufacturing facilities, Ian Tronc returns to inspect the factory to ensure that everything is in place. A trial production run was initiated to smooth out any teething problems and at the same time, train the new local workers.

Trial Production Run | 5th September 2006
Trial Production Run | 5th September 2006
Trial Production Run | 5th September 2006
Trial Production Run | 5th September 2006